Supply And Complete Installation Of Route Data Preparation System (Rdps) As Per Specificatio N Approved By Rdso Tm/Sm/325 March 2021 Or Latest With Pc (If Applicable For Execute Of Above Rdps) An D All Other Accessories. Details Technical Specification Enclosed. Accepted Make/Brand:- Rail Path. [ Warr Anty Period: 30 Months After The Date Of Delivery ] ]