S&T Portion Of Track Renewal Works: (1) Ttr(Tws) - 55 Sets, Ttr(Cmsc) - 53 Sets, Ttr(Fs+Tws+Wcmsc) - 1 Set, Sej - 14 Sets & Glued Joints - 94 Nos Between Jsgr-Kpjg Section Under The Jurisdiction Of Sr. Den(East)/Sbp (2) Ttr(Fs+Tws+Wcmsc) - 6 Sets (1:12), Ttr(Wcmsc) - 7 Sets (1:8.5) & Ttr(Tws) - 7 Sets (1:8.5) Between Lae-Tig Section Under The Jurisdiction Of Den/West/Sbp (3) Ttr(Fs+Tws+Wcms) - 21 Sets (1:12), Tws - 4 Sets (1:8.5), Wcmsc - 4 Sets (1:8.5), Sejs - 5 Sets & Glued Joints - 67 Nos Between Jsgr-Tig Section Under The Jurisdiction Of Sr.Den/Central/Sbp. (4) Sambalpur Division - Ttr(Fs+Tws+Wcmsc) - 41 Sets, Fs - 105 Sets, Cmsc - 46 Sets, Fs+Cs+Cmsc - 2 Sets, Glued Joints - 376 Nos. & Sejs - 79 Nos. (5) Ttr (Fs) & Ttr(Tws+ Cmsc) - 108 Sets (1 In 12 - 68 Sets & 1 In 8.5 - 40 Sets), Gj - 209 Nos & Side Drain - 3510 Mtr Under The Jurisdiction Of Den /East Of Sambalpur Division. (6) Sbp-Dfr - Trr (P) - 8.665 Tkm, Trr(S) - 0.83 Tkm, Ttr (Cmsc) 1 In 12 - 100 Sets, , Ttr(Ds) 1 In 8.5 - 5 Sets, Ttr(Tws+Cmsc) 1 In 12 -3 Set,Ttr(Fs+Tws+Cmsc) 1 In 12-1 Sets & 1 In 8.5 - 20 Set, Side Drain - 4778 Mtr, Under The Jurisdiction Of Den/Central & Den/South Of Sambalpur Division.