Geotechnical Study Required For The Study Of: • Construction Of The Road Linking Rn8 And Douar Maamar Over 5 Km • Construction Of The Road Linking Linda And Talhiyant Over 8 Km • Construction Of The Road Linking Rn8, Talmout And Aghnibou – El Hansali Dam Over 3 Km • Construction Of The Road Linking Rp311 And Lamhajiba Via Louidan Over 6 Km • Construction Of The Road Connecting The Center Of El Hammam And Boufernane (Aït Sidi Youssef Via Tibouda) Over 6 Km • Construction Of The Road Linking Had Bouhsoussen And Aït Moussa Over 4 Km • Construction Of The Road Linking Boukhlala And Tamahoult Via Tafouzzart Over 8 Km • Construction Of The Road Linking Nimiro Tamra And Khenik Dfa Via Tiliwa Nbraouch Over 5 Km – In The Province Of Khenifra -