Geotechnical Study Necessary For The Study Of: • Construction Of The Road Connecting The Center Of El Borj And Ij Ichkak, Asaka District To Khénifra Over 8Km • Construction Of The Lafija Aït Alla - Douar Amhrouq Road Over 6 Km • Construction Of The Track Leading To Ajdir Over 12Km • Development Of The Track Leading To Brahim Jnan Chater And Aouinate Chrbousand Over 4 Km • Construction Of The Knour Road Linking Ihouddine Aït Baji And Aït Chared Over 6 Km • Construction Of The Road Linking Rn8 And Douar Ouajyoun – Ouamoumana Center Over 4 Km • Construction Of The Road Linking Douar Khdi And Habrchich Via Talount Over 4 Km • Construction Of The Road Linking Asaka And Sidi Saïd Over 9 Km • Construction Of The Road Linking Sidi Ali Oubrahim And The Oum Rabia Sources Via Tazougart Over 6 Km • Construction Of The Road Linking Azerzou And Arougou Via Douar Tajmaat (Section No. 1) Over 7 Km – In The Province Of Khenifra -