The Wall On Which The Work Is Done Is In A Poor State Of Construction. Its Poor Condition Is In A Process Of Progressive Deterioration, Which Is Why Its Repair And Constructive Restoration Is Urgent. A Solution Is Proposed That Responds To The Impossibility Of Dismantling The Existing Wall, Proposing A Concrete Wall In Front Of The Existing One And Solidary To It And With Its Foundation Executed On The Road, Thus Avoiding The Emptying Of The Upper Square.