Execution Of Works In The Potable Water Supply Network, Included In Several Projects: - Executive Project To Recover The Borrell And Institute Wells For The Supply Of Potable Water In The Municipality Of Mollet Del Vallès. - Executive Project For The Modification Of The Route Of The Water Pipes At The Railway Crossing, In The Municipality Of Mollet Del Vallès. - Executive Project To Replace A Section Of The Existing Fiber Cement Potable Water Supply Pipe, In Castelao I Palaudàries Street, In The Mollet Del Vallès Municipality. - Executive Project To Replace A Section Of The Existing Fiber Cement Potable Water Supply Pipe On Carrer Jacinto Benavente, In The Municipality Of Mollet Del Vallès. These Actions Contribute To Improving The Guarantee Of Supply Through The Recovery Of Own Underground Catchments, The Repair Of Breakdowns And The Improvement Of The Network In Response To Several Factors: - The Stoppage Of The Exploitation Of The Pous Garbí Following The New Regulatory Requirements Established By Royal Decree 3/2023, Which Regulates The Presence Of Pfas. - The Opportunity To Reduce Dependence On The Purchase Of Water In Bulk In Atl, Increasing Local Water Resilience, And Reducing The Cost Of The Supply Service. Adaptation To The Supply Reinforcement Measures Contemplated In The Drought Emergency Plan. - The Need To Renew And Repair Sections Of Fiber Cement Network, Or Replacement Of Temporary Pipes Installed Due To Breakdown. With The Actions, Progress Is Also Being Made In Complying With The 2030 Agenda And The Sustainable Development Goals.