Construction Of High Level Bridge Across Krishna River Between Jaggaiahpet And Sattenapalli Near Madipadu Village Guntur District. Sub Work Providing Inspection Vehicle On Hire Basis To The Executive Engineer (R&B) Division, Narasaraopet For The Year 2026-27 (For The Period Of Six Months From 01-04-2026 To 30-09-2026