Terminal Strip For Bg Ac Power Car (Wjpclr) For Bangladesh Railways, As Per Drawing: Edml- 275, Rev- Nil, Packing Instruction: Pi042 Ver 3.0 (1) Drawing No. Icf/J&T/Misc-248 7 Alt. `B? To Be Followed. (2) It Should Be Ensured That Item Should Not Rub During Tran Sportation. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. For Underframes: Both (1) & (2) To Be Followed As Stat Ed Above. For Other Items Except Underframes: Only (2) Need To Followed. [ Warranty Pe Riod: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]