Electrical Work Connection To:- (I) Provision Of Toilet For Ss At 10 Stations In Cpj-The Section And 11 Stations In The-Cpr Section Of Bsb Division (Ii) Provision Of Interlocking Of Level Crossing Gates More Than 20000 Tuv Under Jurisdiction Of Sr.Dste-Ii/Bsb With Rtu &Amp Power Supply Arrangement (Total 04 No Lc) (Iii) Provision Of Centralized Traffic Control Between Gkc(Excld)-Chpg &Amp Buw (Excld)-Stp Section Over Ner.