Dod/Did/2025/033 Preparation Of Design Documentation According To The Bim Methodology For The Reconstruction Of The Industrial Quay On Construction Section 35-36 In The Port Of Gdansk, Along With Regulating The Necessary Official Formalities And Option Rights