Development/Update Of Design Documentation And, Based On It, Execution Of Construction Works Consisting Of: Task 1 - Construction Of 110/15 V Gpz Chrzanów Zone With 110 Kv Power Lines, Task 2 - Construction Of An Indoor Station With A 2-Section 15 Kv Switchgear (Rs Strefa), Task 3 - Construction Of Cable Connections Of 15 Kv Switchgear In The Designed 15 Kv Switchgear In The Designed Gpz Chrzanów Strefa I Rs Zone With The Existing 15Kv Network.